ACME Solar has commissioned an additional 19.8 MW at its maiden wind power project in Shapar, Gujarat, bringing the total to 46.2 MW out of the planned 50 MW. With this, its total operational capacity now stands at 2,826.2 MW. Full commissioning is expected soon.
Comments
Post a Comment